Schermata del 2012-01-13 14:51:38.png
altManagement of maxi projects
Due to their vast experience in dealing with complex, long lasting projects and in coordinating the activities of numerous and different design groups, Tecon’s partners have been called to manage some very big projects on behalf of their Clients.
The most important examples are:



Venice flood prevention scheme
(1987-1991)

Owner/Client: Magistrato alle Acque di Venezia / Technital
Management of the engineering team in charge of the design of the flap gates and related equipment and plants. The activities included studies and research projects performed by international hydraulic and structural laboratories and led to the design, construction, installation and test campaigns of the full scale prototype MOSE.

Tiffany jacket, M.S.F and piles (1991-1992)
Owner/Client: AGIP U.K. / C.I.O. (CONSORZIO ITALOFFSHORE)
Management of all engineering activities related to the EPIC contract for the 27000 tons platform including detail design, fabrication engineering, material management, transportation and installation engineering.

Storebælt suspension bridge (1995-1996)
Owner/Client: Danish Authorities / COINFRA
Management of the engineering team co-ordinating the development of the procedures and design of all temporary structures, equipment and tools necessary to erect the nearly 2700 m long suspension bridge over the Storebælt Eastern channel in Denmark.

Ashdod north port development project (1998-2000)
Owner/Client: Israeli PRA / Technital
Management and technical co-ordination of the design of the Ashdod North Port Development, subdivided in two stages at the end of which the total handling capacity of the port will be 20000 tons per year of cargo and 600000 TEU of containers. The design was developed by a group of Italian, Dutch and Israeli marine designers
 

«Back