MILANO-Underground Linea 5 Garibaldi F.S. Bignami (2007-2009)
| Project: |
MILANO-Underground Linea 5 Garibaldi F.S. Bignami |
| Owner / Client: |
METROPOLITANA MILANESE /ASTALDI/TORNO/ROCKSOIL |
| Services: |
Detailed and construction design of three concrete stations.
|
BOLOGNA – High Speed Railway Underground Main Station (2005-2009)
| Project: |
BOLOGNA – High Speed Railway Underground Main Station |
| Owner / Client: |
ITALFERR/STONE/ ASTALDI |
| Services: |
Detailed design of the station concrete-and steel structures. |
Penetrazione urbana S.S. n° 415 Paullese Lotto 4 (2006)
| Project: |
Penetrazione urbana S.S. n° 415 Paullese Lotto 4
|
| Owner / Client: |
METROPOLITANA MILANESE |
| Services: |
Underground tunnel made by the jacked-digged-out pipe technique. |
Underground Line 3 – Extensions “Lotto” 2 and "3" (2005-2008)
| Project: |
Underground Line 3 – Extensions “Lotto” 2 and 3”
|
| Owner / Client: |
METROPOLITANA MILANESE/TORNO INT. S.p.A./IMPRESA |
| Services: |
Detailed design of two open trench stations, several wells and artificial galleries. |
Brescia - Underground Line (2005-2009)
| Project: |
Brescia - Underground Line
|
| Owner / Client: |
METROBRESCIA-ANSALDO-ASTALDI-NESCO |
| Services: |
Detail construction design of five deep stations and two in-out wells for TBM machine. |
Tunneling by TBM under Brescia Town (2005)
| Project: |
Tunneling by TBM under Brescia Town
|
| Owner / Client: |
METROBRESCIA-ANSALDO-ASTALDI-NESCO |
| Services: |
Building response to tunnelling with TBM effects – FEM analyses of concrete and masonry hystorical buildings. |
|