MILANO-Underground Linea 5 Garibaldi F.S. Bignami (2007-2009)

Project: MILANO-Underground Linea 5 Garibaldi F.S. Bignami
Owner / Client: METROPOLITANA MILANESE /ASTALDI/TORNO/ROCKSOIL
Services:  Detailed and construction design of three concrete stations.
Attachments:
Download this file (metro.pdf)Metro Milano
 

BOLOGNA – High Speed Railway Underground Main Station (2005-2009)

Project: BOLOGNA – High Speed Railway Underground Main Station
Owner / Client: ITALFERR/STONE/ ASTALDI
Services:  Detailed design of the station concrete-and steel structures.
 

Penetrazione urbana S.S. n° 415 Paullese Lotto 4 (2006)

Project: Penetrazione urbana S.S. n° 415 Paullese Lotto 4 
Owner / Client: METROPOLITANA MILANESE
Services:  Underground tunnel made by the jacked-digged-out pipe technique.
 

Underground Line 3 – Extensions “Lotto” 2 and "3" (2005-2008)

Project: Underground Line 3 – Extensions “Lotto” 2 and 3”
Owner / Client: METROPOLITANA MILANESE/TORNO INT. S.p.A./IMPRESA
Services:  Detailed design of two open trench stations, several wells and artificial galleries.
Attachments:
Download this file (metro.pdf)Metro Milano
 

Brescia - Underground Line (2005-2009)

Project: Brescia - Underground Line
Owner / Client: METROBRESCIA-ANSALDO-ASTALDI-NESCO
Services:  Detail construction design of five deep stations and two in-out wells for TBM machine.
Attachments:
Download this file (metrobrescia.pdf)Metro Brescia
 

Tunneling by TBM under Brescia Town (2005)

Project: Tunneling by TBM under Brescia Town
Owner / Client: METROBRESCIA-ANSALDO-ASTALDI-NESCO
Services:  Building response to tunnelling with TBM effects – FEM analyses of concrete and masonry hystorical buildings.
Attachments:
Download this file (metrobrescia.pdf)Metro Brescia
 