Porto Empedocle - Enel LNG Marine Terminal (2009)
| Project: |
PORTO EMPEDOCLE - Enel LNG Marine Terminal |
| Owner / Client: |
ABB - MILAN |
| Services: |
Bid design of alternative solution of a Caisson Breakwater and geotechnical consultanc. |
Dunkerque - LNG Project - Marine Terminal (2008)
| Project: |
DUNKERQUE - LNG Project - Marine Terminal |
| Owner / Client: |
Dunkerque LNG-EDF-CIT/SOGREAH-SOFREGAZ |
| Services: |
Feed structural design of a marine terminal for 70.000 to 250.000 LNG carrier. |
Kashagan - Rosetti Fabrication Yard (2009)
| Project: |
KASHAGAN - Rosetti Fabrication Yard |
| Owner / Client: |
ROSETTI MARINO |
| Services: |
Detailed Design of the quay structures and site preparation for the fabrication yard at Ak-shukhur. |
Porto MargheraCanale Sud - New Terminal 33/34 Bis (2007-2008)
| Project: |
PORTO MARGHERA Canale Sud - New Terminal 33/34 Bis |
| Owner / Client: |
POLIMERI EUROPA |
| Services: |
Multi-discipline FEED design of the new terminal quay for petrochemical products. |
Kashagan - Saipem Fabrication Yard (2003)
| Project: |
KASHAGAN - Saipem Fabrication Yard |
| Owner / Client: |
Saipem |
| Services: |
Detailed Design of the quay structures for the fabrication yard at Kurik |
Ashdod North Port development project (1998-2000)
| Project: |
ASHDOD NORTH PORT DEVELOPMENT PROJECT |
| Owner / Client: |
TECHNITAL |
| Services: |
Management and technical co-ordination of the design of the Ashdod North Portdevelopment, subdivided in two stages at the end of which the total handling capacity ofthe port will be 20000 tons per year of cargo and 600000 TEU of containers.The design is developed by a group of Italian, Dutch and Israeli marine designers. |
Boosaaso Harbour (1988)
| Project: |
BOOSAASO HARBOUR |
| Owner / Client: |
TECHINT |
| Services: |
Feasibility study and basic design of the new harbour of Boosaaso, Somalia, including thestructural design of all breakwaters and quays. |
|
|
|
|