East Anglia One - Wind Farm

Owner: EAST ANGLIA ONE
Client: TECHNIP ROME/ALSTOM
Country: North Sea
Period: - 2012
TECON SOW: Feasibility engineering of a wind farm converter platform
Work description

The converter platform is made up by the following components:

  • A topside 60x50x36 m weighing 7000 tonnes
  • A four leg foundation jacket in 35-40 m water depth weighing 3000 tonnes
  • Piled foundations weighing 1500 - 2000  tonnes
Tecon services
  •  Feasibility Design of the Platform (Topside + Jacket)
  •  Lifted and Float-over options for the Topside installation
  •  Design of the main structures and piling for the in service conditions
  •  Dynamic analysis for the wave impact
  •  Installation analyses
  •  Preliminary weight estimate and weight report
  •  Preliminary specifications for construction
  •  Tekla modelling of the main structures